Summary

Start 6:18 pm
Finished 6:40 pm

Location

RMM 5502 1st ave N Birmingham, AL 35212

Participants

  • Shirley Hicks
  • John Rhymes
  • Chris Lais
  • Trae Watson
  • Kurt Fattig
  • Sandy Campbell
  • Maker Geoffrey
  • Maker Julie

Maker Meeting Agenda

  • New volunteer to take minutes
  • New volunteer to moderate

Old

New

Upcoming events

Projects

Proposals

Lab Host updates, feedback, parking requests

  • biolab
  • communal space host
  • computer lab
  • circuits lab
  • fiber lab
  • meeting room
  • print lab
  • Shape lab
  • Web & tech

Nominations

votes

  • Katie Elkins - keyholder

Closing announcements

Back Burner

Votes

Minutes

  • Volunteer to take minutes - Shirley Hicks
  • Volunteer to moderate - John Rhymes

Old

  • Review of previous minutes
    • Vote taken to approve minutes - - 3 in favor, 2 abstentions, 0 opposed
  • Review of events
Hall painting - 10 people out to paint. First coat went up. Thanks Steven Wyss, Shirley Hicks. Alison, Mark Gilbert, his friend Julie, John Rhymes, Trae Watson, Stephen Ricks, Sandy Campbell and ?
Second day scheduled on Sunday, 3 people came out to paint. Thanks Katie Elkins, Shirley Hicks and John Rhymes.
Still to be finished - rear east hall, another retouch in the center hall.
Phase 2 (to be scheduled) - will be second meeting room, side hall, ceramics area and center safety/first aid area.

Work thaat still needs to be done - rad removal in 2nd meeting room, currently detached from system, can tip over easily. Marked with caution tape. Mark Gilbert looking into removal options, including calling Sloss arts group to salvage it for reuse in casting.

Member storage area has been moved to right rear room at end of east hall. JC and Sandy covered exposed pipe to render area safe. Member storage cabinets moved into room and light fixed. Old member storage area (the seventies lounge) is now a second meeting room. Can be used now for small meetings and group activities now.

New

Upcoming events

Celeste has arranged a fermentation workshop with Harvest Farms. Will be in the next two weeks, watch Meetup page for updates. Will be a paid event. Celeste negotiating space usage rate.

Projects

Paint the halls - update above.
Planter soaker hose installed. John will get the rest of the hardware for watering automation project.
Trae - prior art wiki statement
Trae - will be working with Alabama Sustainable Agriculture Network - will be doing some installation sculpture. Some work to be done at the space.
TrimTab brewery project - call for interest to help them solve a jig project. Take discussion outside of meeting.

Proposals

Lab Host updates, feedback, parking requests

  • biolab
    • Ali will be back in town this week. Activity should resume.
  • communal space host
    • James (Russell taking over this week) - no update
  • computer lab
    • no updates
  • circuits lab
    • Steven Wyss led lab rearrangement - is more functional
    • Light fixture replacement planned
  • fiber lab
    • No updates
  • meeting rooms
    • No updates beyond painting cleanup
  • print lab - no change
    • Seth will be reviewing current tech library collection.
    • Plan is to disperse books to relevant labs, with collections being reviewed to ensure that they have current and useful information. (Fiber lab currently has best collection of materials)
    • Remaining smaller general library to land in second meeting room.
  • Shape lab
  • No change - still need member help labelling and sorting tools
  • Web & tech
    • No change

Nominations

Votes

Closing announcements

Back Burner

Votes

minutes approval - 3 in favor, 2 abstentions, 0 opposed